1. Operational Scope & Eligibility
Last Updated: September 2026
Jimcan Construction Ltd ("Jimcan Construction", "we", "our") is a licensed general contractor registered in the Republic of Uganda. We specialize in residential builds up to 4 storeys, commercial office fitouts, functional storage warehouses, and structural renovations across Uganda.
By engaging our services, requesting estimates, or executing a formal building contract, clients agree to the conditions outlined herein.
2. Quotations, Estimates & Bills of Quantities (BOQ)
2.1 Preliminary Estimates: Verbal consultations, web calculator outputs, and ballpark figures provided during preliminary brief discussions are indicative only and do not constitute a binding financial agreement.
2.2 Formal Bills of Quantities: Binding commitments require an itemized Bill of Quantities (BOQ) prepared by a qualified quantity surveyor, grounded in verified architectural blueprints, structural engineering calculations, and site geotechnical data.
2.3 Validity: Due to market price movements for cement, rebar steel, timber, and fuel in East Africa, formal written quotes remain valid for thirty (30) calendar days from issuance unless otherwise noted in writing.
3. Engineering Standards & Statutory Approvals
3.1 Regulatory Compliance: In accordance with our guiding principle, "Quality is our pride", all civil works, concrete batching, steel reinforcement, and joinery comply with the Building Control Act, 2013 of Uganda and the specifications of the Uganda National Bureau of Standards (UNBS).
3.2 Municipal Authorizations: The client is responsible for providing valid legal land title ownership documents and municipal building permits issued by the relevant local authority or the National Building Review Board (NBRB). Jimcan Construction assists with documentation and liaison where contracted.
4. Site Possession, Safety & Access
4.1 Clear Site Access: Clients must provide unobstructed legal and physical access to the project site for machinery, concrete delivery, and labor mobilization prior to commencement.
4.2 Occupational Safety: Active construction zones are strictly restricted. Visitors, clients, and inspectoral personnel must wear approved Personal Protective Equipment (PPE) including hard hats and reflective vests provided on-site.
5. Variations & Milestone Payments
5.1 Change Orders: Any architectural alteration, material specification change, or scope addition requested during construction must be formalized in a written Change Order signed by both parties before work proceeds.
5.2 Milestone Billing: Contracts operate on transparent stage valuations (e.g., substructure foundation, framing & slab casting, roofing, MEP rough-ins, and final architectural finishes). Invoices are verified against completed site milestones.
6. Defects Liability Period
Jimcan Construction provides a standard Defects Liability Period (typically six months from practical completion) during which any structural or workmanship defects identified are rectified promptly at our expense, excluding fair wear and tear or third-party modifications.
7. Governing Law & Jurisdiction
These terms and all construction agreements shall be governed by, construed, and enforced in accordance with the substantive laws of the Republic of Uganda. Any disputes arising shall be resolved primarily through collaborative mediation or the competent courts of Kampala, Uganda.
8. Contact & Contractual Enquiries
For inquiries regarding our terms of service, project contracts, or formal tenders, please contact our administrative leadership:
Jimcan Construction Ltd
Plot 8, Oyite Ojok Lane, P.O. Box 177332, Kampala, Uganda
Phone: +256 781 812 828 / +256 785 087 692
Email: info [at] jimcanconstruction.com